Newsflash
Newsflash
The TrueFire, the ClearFire and the ICB! These exciting new boilers from Cleaver-Brooks offer you the best technologies on the market!


Main Menu
Main Menu
 Home
 Find a Rep
 Get A Quote
 Request Information
 Boiler University
 Boiler Services
 Pre Owned Equipment
 What's New
 Technical Information
 Preventive Maintenance Steps
 Maintaining Boiler Logs
 ASME Code Changes
 Energy Saving Tip
 Employment Opportunities
 Legal

Login Form
Username

Password

Remember me
Forgotten your password?


Online
Who's Online
We have 11 guests online

  
Energy Saving Tip   PDF  Print  E-mail
A stack temperature gauge should be installed in the flue outlet of every boiler and monitored regularly to ensure that the temperature is consistent with the firing rate, operating temperature for hot water boilers or pressure for steam boilers and boiler design.  Your boiler supplier or manufacturer should be able to provide data to give you an indication of optimum performance.  For example, a Cleaver Brooks firetube boiler should operate with a stack temperature no higher than approximately 75 to 100 °F above the water temperature in a hot water boiler or saturated steam temperature in a steam boiler at high fire. 

Accumulations of soot or scale on the heat exchange surfaces of the boiler, however, act to impede heat transfer, thereby resulting in higher exit flue gas temperatures than normal.  A thickness of 1/32” and 1/16” of soot on the fireside heat transfer surfaces, for example, will increase fuel costs 3% and 8%, respectively.  Scale will increase fuel costs by 4% and 9% for the same deposit thicknesses on the boiler waterside.  In addition to added fuel costs, these conditions left unchecked will lead to premature pressure vessel failure.

If we can be of service to you in determining optimal performance for your boiler, or you need a stack temperature gauge to monitor your boiler’s performance, please contact or visit the website of the CBRA Member located in your area.

 


  
Polls
Polls
How soon do you plan on purchasing your next boiler?
Immediately
In a few weeks
In a few months
More then six months
Not planning on purchasing
  

Events Calendar
May 2008
SMTWTFS
27
28
29
30

Newsfeeds

Site designed by The Sandland Group, LLC




Site copyright (c) 2004 by Cleaver Brooks International Representatives Association. All Rights Reserved.
Please review our Legal Policy.